Address
304 North Cardinal
St. Dorchester Center, MA 02124
Work Hours
Monday to Friday: 7AM - 7PM
Weekend: 10AM - 5PM
Address
304 North Cardinal
St. Dorchester Center, MA 02124
Work Hours
Monday to Friday: 7AM - 7PM
Weekend: 10AM - 5PM

Xingyi Toy is a custom vinyl figure manufacturer based in Shenzhen. For over 12 years, we have focused on one core service: turning designers’ art toys, blind boxes and collectible figures from artwork into retail-ready physical products that pass safety inspections and sell well. We have partnered with more than 2,000 clients worldwide, including independent artists, art toy labels, IP owners, OEM buyers and distribution traders.
Vinyl toy manufacturing relies on molding and rotational casting. At our Shenzhen factory, the full workflow starts with 3D modeling. Our sculptors split the character into separate parts — head, body, limbs and accessories — while defining joints, alignment points and draft angles for smooth demolding. Next comes the wax master stage. Unlike injection molds, vinyl tooling does not mill directly from CNC. We first carve a master model in red wax or white wax. Red wax captures finer details and delivers a cleaner surface finish, which is our most popular choice for clients. Once the wax master is approved, we use it to produce iron molds. One mold set costs $200–$500. If a character is split into 5 components, total mold investment will be $1,000–$2,500, with a lead time of 1–2 weeks.
With the molds ready, the actual vinyl process begins: Liquid PVC paste is poured into the iron mold, sealed and placed inside a rotating oven. The mold spins on two axes at 240–280°C, so PVC paste evenly coats the inner cavity and forms a hollow shell with a consistent wall thickness of 2–3 mm. After water cooling, workers remove the blank with needle-nose pliers. Trimming, sanding and deflashing follow to eliminate excess material and seam lines, resulting in a raw white blank. Painting is next: one color requires one separate spray pass. More colors mean higher labor cost. Fine details such as eyes and logos are applied via pad printing in layered steps. Even a single eye may need separate passes for sclera, iris and highlight. Designated parts are assembled with specialized adhesive when required. We then complete standing tests and center-of-gravity checks, followed by QC inspection, cleaning and final packaging. The pre-production sample is the critical approval checkpoint. Xingyi Toy offers free pre-production samples for bulk orders; clients only cover the shipping cost. Mass production will never start until the pre-production sample is fully signed off.
There is no fixed unit price for custom vinyl figures. Costs are split across every production stage:
Our OEM service starts at 50 pieces. Lead time from design to delivery is 3–5 months, or 1–2 months for rush orders. Final pricing depends on sculpt complexity, color layers, order quantity and special requirements.
Our MOQ for custom vinyl figure OEM is 50 pieces. This is far lower than most factories, which often set minimums at 3,000 pcs — a barrier for independent artists and small creative brands. With a 50-piece run, you can invest in your own iron molds, launch a small batch for market testing, sell at conventions, or run crowdfunding campaigns without overstocking inventory. Even at 50 pcs, every step stays intact: 3D modeling, parting design, red/white wax master, iron mold tooling, pre-production sampling, spray painting, pad printing, assembly, QC and packaging. You retain full ownership of your IP, so no third party can reproduce your figure. If you are looking for “no MOQ vinyl figures”, this is the closest viable option for rotocast vinyl production. You only commit to one mold set and 50 units instead of thousands. Note: Fixed tooling and sampling costs are spread across fewer units at low volumes, so unit price drops significantly once your order reaches 500 or 1,000+ pieces.
Overall turnaround: 60–90 days (3–5 months) from design to delivery, subject to sculpt complexity, color layers and order size.
Vinyl rotocasting is an excellent choice for blind boxes and pop-style collectibles, especially rounded chibi designs with fewer components. Vinyl figures feel lightweight and are relatively shatter-resistant when dropped, with consistent hollow wall thickness. Spray painting and pad printing deliver clean details for eyes, blush and logos. Chase variants and secret editions common in blind box series can be achieved simply by swapping colorways or accessories. We have produced dozens of such pop-style vinyl series for our clients.
That said, vinyl is not always the best fit: If your figure is smaller than 5 cm, runs in hundreds of thousands, has highly complex structures, or requires transparent parts and snap-fit hard plastic mechanisms, injection molding will be more cost-effective and stable. To sum up: vinyl works best for small-to-medium runs, designer art toys, collectible blind boxes and pop-style figures. High-volume, low-cost blind boxes are typically produced by injection molding.

We implement full-process QC from raw material intake to shipment. Our factory holds BSCI and ISO 9001 certification. PVC paste, colorants, paint and pad-print inks go through safety screening before production, restricted substances including phthalates are controlled at source to meet CE and EN71 standards. During production:
Ready to bring your character from screen to physical collectible? Xingyi Toy accepts OEM orders starting from 50 pcs. We deliver prototypes in 5–7 working days, iron molds in 1–2 weeks, and free pre-production samples for bulk orders (shipping at client’s cost). We provide one-stop service covering 3D modeling, parting design, red wax master, tooling, spray painting, pad printing, assembly, QC and packaging. All products support CE/EN71 certification. With 12+ years of experience and 2,000+ brand collaborations, our standard turnaround is 60–90 days from design to delivery. Do not leave your great design only on paper. Send over your 2D artwork or 3D files, and we will send you a formal quotation, compliance roadmap and production schedule within 2–3 working days.